Pwodwi detay
Yon sistèm tren solè serye se kolòn vètebral nenpòt etalaj PV ankadre. Pou EPCs ak distribitè, akizisyon se pa sèlman sou achte aliminyòm extrusion-li nan asire pwofil la, konektè episur, ak kranpon modil travay ansanm sou sit. Bristar fabrike pwofil estriktirèl PV nan aliminyòm AL6005-T5, ranpli ak koutim pwoteksyon sifas anodize. Nou verifye jeyometri seksyon ak koòdone Fastener kont desen ou yo anvan pwosesis pakèt kòmanse.

Ranpli ekipman pou Materyèl Mounting
Ankadreman modil, espas atachman, ak chaj van varye selon sit. Olye pou nou fòse pwojè yo nan dimansyon katalòg fiks, nou bay ray, longè koupe, ak aranjman fixation ki baze sou layout aktyèl ou. Yon pake konplè gen ladan pwofil aliminyòm lan, plak episur, kranpon mitan / fen, boulon T, ak pattes baz. Lè yo kenbe eleman sa yo nan menm fanmi koòdone, ekip enstalasyon yo evite pyès ki nan konpitè ki pa matche.

Deskripsyon videyo
Konfigirasyon Sistèm pou Lòd Pwojè
Ka ekipman pou tren dwe ranje alantou layout aktyèl la aliye. Tou depan de pwojè a, chajman an ka gen ladan pwofil extrusion, moso episur, kranpon modil, fastener chanèl, konpozan baz ak pyès ki nan konpitè atachman ki nesesè yo. Konbinezon an eleman tcheke kont koòdone nan tren espesifye anvan anbalaj, diminye risk pou ti pati enkonpatib yo melanje nan lòd la.



Espesifikasyon teknik ak materyèl
| Materyèl | AL6005-T5 Aluminum |
| Anodized finish (>=10 μm standard, custom available) | |
| Stock lengths or cut-to-size based on drawings | |
| Rated up to 60 m/s wind and 1.4 kN/m² snow (site-dependent) | |
| Meets AS/NZS 1170.2 where required | |
| ISO 9001 certified manufacturing |
We give buyers control over both the profile and the connecting hardware. Distributors get stable part references for inventory management, while EPCs get batches identified by project delivery sequence. Whether you need a standard shape or a custom Solar Panel Rail System, we validate the dimensions, anodizing specs, and packing format before any metal is cut.



Send the array layout, rail profile, module frame thickness, required accessory list and order quantity for BOM review and factory pricing.
Inspection starts with your approved drawings. We measure profile dimensions, channel widths, and cut lengths at specific production stages. The most critical step is physical trial-fitting: splice pieces must slide in without binding, and clamps must seat firmly in the extrusion channel.
For repeat Solar Panel Rail System orders, we retain original drawings and approved part references to ensure batch-to-batch consistency. We supply dimensional records and surface-treatment reports with shipments, and accommodate third-party pre-shipment inspections when written into the order.





Baj popilè: Sistèm Rail Panèl Solè, Rail Mounting Solè

